Awake early to watch qualy for the Oz
GP – good grief but this new qualy system is a load of bollocks! – then got
stuck in on the boat. Ian’s list of jobs for today: refit 6 windows, fit exhaust outlet fitting and connect pipe
(got to remove aft bunk to do that), fit water anti-syphon breather, fit 3 gas
locker vent covers, wire charger to engine battery, fit bilge pump, refit
companion way, plus lots of other little jobs.
I think he got through the list.
Windows
Gas locker vents
We are particularly happy with the
new stripes:
Before
After
Paint job on transom before
And after
Whew, lots of work but worth it in
the end.
This afternoon I got down to cleaning
up inside, which was total chaos. Only
1/3 completed and we have to move all the stuff back on that was taken
off and stored in the shed, and move back all the stuff that has accumulated in
our bedroom and the kitchen.
We counted the layers of paint we put
onto the hull:
Below water – 2 coats green epoxy pre-primer, 3 coats black epoxy barrier paint, 2 coats anti-fouling.
Above water – 2 coats primer, 2 coats
white topcoat, 2 coats blue stripes.
That’s a lot of paint
Pic 3 shows how really tatty she was looking. Bet the previous owner would love to see her now.
ReplyDelete